Our services

PROCESS DESIGN & CONSULTANT


  • Site evaluation
  • Identified Losses
  • Define opportunities
  • Providing Solutions
  • Feasibility Studies
  • Risk & Life Cycle Cost analysis
  • Design Engineering
  • Project Management & Execution
  • Commissioning & Qualification
  • Training & Handover & Post project
  • HIGH QUALITY
  • HIGH EFFICIENCY
  • HIGH FLEXIBILITY

Our services

TPM Training Class


image

Spare part management

image

Early Equipment Management (EEM/VSU)

image

Progressive Maintenance

AREA OF EXPERTISE


PHOTO Losses Identified Audit Objective
  • Condensate & Flash steam loss
  • Steam to fuel ratio is only 10-11
  • Stack Oxygen is not controlled
  • Excessive blowdown
  • Condensate recovery projects , can increase to 90%
  • Optimize steam to fuel ratio and Stack Oxygen
  • Estimated saving : 5% on Fuel bill
  • Water usage in Melting process
  • Water recovery project
  • Estimated water saving > 40%
  • Minimize Safety risks
  • Minimize labors in process
  • Affordable Automation Ex Collaborative robot system.
  • New conveyor design
  • Potential reduction 4 HC
  • Water usage in Cleaning room
  • Food safety issue
  • Minimize labors in process
  • Affordable Automation Ex Cleaning machine
  • Potential reduction 5 HC
  • Minimize labors in process
  • Affordable Automation Ex Collaborative robot system.
  • Potential reduction 2 HC
© 2018-2020 Zenithtech Engineering & Solution Co.,Ltd. All rights reserved. Powered by Phuket Solution